variances
英 [ˈveərɪənsɪz]
美 [ˈvɛriənsɪz]
n. 变化幅度; 差额
variance的复数
柯林斯词典
- PHRASE (与…)不一致,相矛盾
If one thing isat variance withanother, the two things seem to contradict each other.- Many of his statements were at variance with the facts...
他的说法有很多和事实不符。 - This idealistic concept is at variance with reality.
这种理想主义的观念和现实相矛盾。
- Many of his statements were at variance with the facts...
- N-VAR 差异;不同
Thevariancebetween things is the difference between them.- ...the variances in the stock price.
股票价格的变化 - ...total revenue variance.
总收入的差异
- ...the variances in the stock price.
双语例句
- It also contributes to the oversight function by highlighting completions, variances, and progress-to-date.
它还通过强调完成、变化,和至今的进展,对监督功能做出贡献。 - You take all the risky assets* and you analyze them first to get their& you have to do a statistical analysis to get their expected returns, their variances, and their covariances.
你需要对所有的风险资产进行分析,首先要得到它们的-,你必须要做一个统计分析,算出它们的预期收益率,方差,和它们的协方差。 - Compare planned cost variances to actual cost variances.
将计划成本差异与实际成本差异进行比较。 - Also, price and efficiency variances often are linked; in such cases, the total effect on the company's costs is moire meaningful than are individual variances.
另外,价格和效率差异经常存在一定联系,在这种情况下,研究公司成本的总影响比单独研究个别差异更有意义。 - These variances are defined by the variable geometries and the usable thickness of the casework and walls.
这些变化决定于可变的几何形状和使用厚度个案和墙壁。 - The budget variance analysis column can be set up on how you review the budget variances.
预算差异分析这一列可以根据您查看预算差异的方式来设置。 - In addition to process variation, supply power operating temperature are also possible on-chip variances.
除了工艺上的变异之外,电源电压以及操作温度也可能造成芯片上变异。 - A method of combining regression functions and sample variances is also presented to make full use of previous data and raise the precision of forecasts and controls.
文中还提出了组合回归函数的概念,从而可以充分利用以往数据和经验,提高预测和控制的精度。 - Creating distinct variances of depth and width.
现出明显的不同深度和宽度的环状。 - This is possible if variances are identified and informed actions are taken at major design milestones.
这是可能的,如果差额确定,并通知采取行动的主要设计的里程碑。