impounding
英 [ɪmˈpaʊndɪŋ]
美 [ɪmˈpaʊndɪŋ]
v. 暂时没收; 扣押; 收留(待领的狗、猫等)
impound的现在分词
柯林斯词典
- VERB 扣押;没收
If somethingis impoundedby policemen, customs officers or other officials, they officially take possession of it because a law or rule has been broken.- The ship was impounded under the terms of the UN trade embargo...
该船因触犯联合国贸易禁运条款而被扣押。 - The police moved in, arrested him and impounded the cocaine.
警察冲进去将他拘捕并没收了可卡因。
- The ship was impounded under the terms of the UN trade embargo...
英英释义
noun
- placing private property in the custody of an officer of the law
双语例句
- Finally, an essential propose is given to effectively evaluate stability of the landslide under natural impounding conditions.
这为进一步进行蓄水条件下稳定性的有效评价提供了理论依据。 - The atomic energy agency could be made responsible for the impounding, storage, and protection of the contributed fissionable and other materials.
原子能代理处能够为滤网、储蓄、捐献可裂变物质保护和其他能源负责。 - Scheme of impounding in advance for the Three Gorges Reservoir by considering the comprehensive utilization benefits The Artificial Regulation Groundwater Excess Exploited Funnel between Jining and Wenshang
考虑综合利用要求的三峡水库提前蓄水方案济宁-汶上超采漏斗区水资源人工调蓄方案研究 - Meshif is an honorable man, but I fear that he is growing impatient with me about impounding his ship.
马席夫是一个十分正直的人,但是我害怕他对于我拘留他的船而越来越没耐性。 - The main problem on simulation of tectonic stress field after reservoir impounding in the head area of the Three Gorges is the influence of "canyon effect" and "rock soften".
迄今为止,长江三峡库首区蓄水对上地壳构造应力场影响的数值模拟研究中存在的最大问题是未考虑地形“峡谷效应”和库水下渗导致“岩石弱化”的影响。 - When impounding commodities, goods or other property, the tax authorities must issue a receipt for the items impounded.
税务机关扣押商品、货物或者其他财产时,必须开付收据; - Therefore, it is considered that after reservoir impounding, the main bank-slope engineering geological problems of study area is the resurrection of the old landslide on the right bank and the occurrence of new landslide on the left bank.
因此,认为水库蓄水后,研究区主要的岸坡工程地质问题是右岸老滑坡的复活和左岸新滑坡的发生。 - The result shows that this model can effectively coordinate the benefits of flood control, power generation and transportation of the Project in the process of impounding.
结果表明,优化设计能权衡防洪与兴利之间的关系,充分挖掘汛初与汛末的潜力,提高三峡水库运行初期的综合效益。 - Layout of Dongfeng Hydropower Station and Observation and Analysis of Arch Dam Character in the Early Impounding Stage
东风水电站枢纽布置及初期蓄水拱坝性态观测分析 - The results show that tiltmeter has responded to reservoir impounding, especially in the detail layers of long period.
结果显示:水管倾斜仪对蓄水效应有较好的响应,主要在数据的长趋势项(周期稍长的细节层)有反映;